Service

Ceiling Installation

Suspended grids, plasterboard ceilings and access provision — set level, supported properly and coordinated with services.

Ceiling Installation work being carried out on site

A ceiling is the surface everyone sees and nobody thinks about until it sags, cracks at the joints, or has to be cut open to reach a valve. Getting it right is a matter of setting out, support centres and planning access before the boards go up.

Setting out and level

Ceilings are read against the horizontal lines around them — window heads, door frames, shadow gaps. A ceiling that is level but set out to the wrong datum still looks wrong. We establish the datum from the features the eye will compare it against, then set the whole ceiling to that.

Support and fixing centres

Sagging between joists and cracking along board joints both come from inadequate support. Hangers, channels and noggins at correct centres, boards staggered and fixed at proper spacing, and joints taped and filled properly — these are the unglamorous details that determine whether a ceiling still looks flat in five years.

Coordinating services and access

The void above a ceiling carries lighting, cabling, pipework and sometimes ductwork. All of it needs to be in place and tested before boarding, and anything requiring future access — valves, junction boxes, dampers — needs an access panel designed in. Cutting one in afterwards is always uglier than planning one in.

spec-sheet
Systems
Suspended grid · Plasterboard · Bulkheads
Setting out
Datum referenced to openings and features
Support
Hangers and channels at design centres
Services
Coordinated and tested before boarding
Access
Panels planned at valves and junctions
Joints
Taped, filled and sanded flat
Integration
Lighting and diffusers set out with the grid

What you get

Why this is done properly.

  • Datum-referenced setting out

    Level established against the openings and features the ceiling will be visually compared to.

  • Correct support centres

    Hangers, channels and noggins spaced to prevent the sagging and joint cracking that shows up years later.

  • Services coordinated first

    Lighting, cabling and pipework installed and tested before boarding, so nothing is opened up again.

  • Access designed in

    Panels planned at valves and junctions rather than cut in later when something needs reaching.

  • Properly finished joints

    Taped, filled and sanded so joints do not telegraph through the decoration.

  • Grid and plasterboard both

    Suspended systems and monolithic plasterboard ceilings, specified to suit the space and the services above.

How it runs

From survey to handover.

  1. 01

    Survey & set out

    Datum established and the grid or framing laid out against the room's existing lines.

  2. 02

    Services coordination

    Lighting, cabling and pipework completed and tested in the void before boarding.

  3. 03

    Install

    Framing and boards fixed at correct centres, with access panels formed as planned.

  4. 04

    Finish

    Joints taped, filled and sanded ready for decoration.

Gallery

Representative imagery.

Representative imagery for this discipline — not photographs of specific ICE-Premium jobs.

  • Ceiling Installation work being carried out
  • Ceiling Design work being carried out
  • Electrical Installations work being carried out

Questions

About ceiling installation

Start here

Tell us what you are building. We will survey it properly.

The initial consultation and site survey cost you nothing and carry no obligation. You will get a written scope and a fixed price against it — not an estimate that moves later.